Inspection & Quality Control

Complete Inspection Checklists

Ensure your abutment meets all structural and safety requirements.


πŸ“‹ Inspection Overview

βœ… Three Critical Inspection Points

  1. Pre-Pour Foundation - Before base concrete
  2. Pre-Pour Wall - Before wall concrete
  3. Final Inspection - Before loading bridge

πŸ” Inspection #1: Pre-Pour Foundation

Timing: Before pouring base slab concrete
Inspector: Self or building inspector
Duration: 30-60 minutes

Foundation Checklist

Excavation & Bearing Soil

Pass Criteria: Firm soil that forms a ball when squeezed but isn’t muddy

AB3 Aggregate Base

Pass Criteria: Compaction test documentation showing 95%+ (REQUIRED!)

Ground Anchors

Pass Criteria: All anchors at correct depth and spacing

Base Slab Rebar

Pass Criteria: Use cover meter or measure - 3” minimum cover is CRITICAL

Bearing Plates

Pass Criteria: Laser level shows plates at exact same elevation Β±1/16”

Drainage Pipes

Pass Criteria: 2% minimum slope confirmed with level


Inspection #1 Sign-Off

Inspector Certification

Inspector Name: _______________________________

Date: ______________ Time: ______________

Result: ☐ PASS - Approved to Pour ☐ FAIL - Corrections Required

Notes/Deficiencies:

_________________________________________________________________

_________________________________________________________________

Signature: _______________________________


πŸ” Inspection #2: Pre-Pour Wall

Timing: After base cured 7 days, before pouring wall
Inspector: Self or building inspector
Duration: 30-45 minutes

Wall Inspection Checklist

Base Slab Condition

Pass Criteria: Compressive strength β‰₯2,000 PSI after 7 days

Wall Vertical Rebar (R3 & R4)

Pass Criteria: Spacing accurate, proper lap lengths, correct cover

Wall Horizontal Rebar (R5)

Pass Criteria: Horizontal bars at correct elevations, properly tied

Wall Forms

Pass Criteria: Forms plumb within 1/4” per 10 feet


Inspection #2 Sign-Off

Inspector Certification

Inspector Name: _______________________________

Date: ______________ Time: ______________

Result: ☐ PASS - Approved to Pour ☐ FAIL - Corrections Required

Notes/Deficiencies:

_________________________________________________________________

_________________________________________________________________

Signature: _______________________________


πŸ” Inspection #3: Final Inspection

Timing: Minimum 14 days after wall pour, before loading
Inspector: Building inspector (official)
Duration: 45-90 minutes

Final Inspection Checklist

Curing & Strength

Pass Criteria: Test cylinders show 3,000 PSI minimum at 28 days

Concrete Quality

Pass Criteria: Sound concrete with no structural defects

Dimensional Accuracy

Pass Criteria: All dimensions within tolerance

Drainage System

Pass Criteria: Water flows freely through drainage system

Backfill & Grading

Pass Criteria: Proper compaction and drainage

Safety & Access

Pass Criteria: Site safe for beam installation


Final Inspection Sign-Off

Official Inspector Certification

Inspector Name: _______________________________

License #: ______________ Jurisdiction: ______________

Date: ______________ Time: ______________

FINAL DETERMINATION:

☐ APPROVED - Ready for beam installation
☐ CONDITIONAL - Corrections required (see notes)
☐ REJECTED - Major deficiencies

Conditions/Notes:

_________________________________________________________________

_________________________________________________________________

_________________________________________________________________

Maximum Load Rating: _____________ lbs per abutment

Inspector Signature: _______________________________

Date: ______________


πŸ“· Photo Documentation

Required Photos for Inspection

Take photos at each stage:

Foundation Stage:

  1. Excavation (before AB3)
  2. AB3 installation (during compaction)
  3. Ground anchors installed
  4. Base rebar grid (before pour)
  5. Bearing plates positioned

Wall Stage:

  1. Base after 7-day cure
  2. Wall rebar installed
  3. Forms erected and braced
  4. During wall pour
  5. Wall after form removal

Final Stage:

  1. Completed abutment (all angles)
  2. Bearing plates (close-up)
  3. Drainage outlets
  4. Overall site conditions

File naming: [Date]_[Stage]_[Description].jpg


⚠️ Common Inspection Failures

Top 10 Reasons Abutments Fail Inspection

❌ #1: Insufficient Concrete Cover

Required: 3" minimum
Common mistake: Using wood blocks instead of proper chairs
Fix: Remeasure before pour, use correct height chairs

❌ #2: Poor AB3 Compaction

Required: 95% Modified Proctor
Common mistake: No compaction test
Fix: Hire testing company ($100-200)

❌ #3: Bearing Plates Misaligned

Required: Exact position Β±1/4"
Common mistake: Not using laser level
Fix: Rent laser level, measure three times

❌ #4: Inadequate Lap Splices

Required: 6" minimum into base
Common mistake: Verticals not lapped enough
Fix: Ensure 6" lap before wall pour

❌ #5: Premature Loading

Required: 14 days minimum cure
Common mistake: Loading after 7 days
Fix: Wait for test cylinders, minimum 14 days


πŸ“Š Inspection Summary Form

Print this page for your records

ABUTMENT INSPECTION SUMMARY

Project Location: _______________________________________

Owner: _______________________________________

Contractor: _______________________________________

Inspection Date Result Inspector
Foundation (Pre-Pour) ________ ☐ Pass ☐ Fail ________
Wall (Pre-Pour) ________ ☐ Pass ☐ Fail ________
Final Inspection ________ ☐ Pass ☐ Fail ________

PROJECT STATUS:

☐ APPROVED FOR BEAM INSTALLATION
☐ CONDITIONAL APPROVAL (see notes)
☐ NOT APPROVED

Notes: __________________________________________________

_________________________________________________________________

_________________________________________________________________